Prepared for Illustrative County Board of Commissioners · Illustrative Region · 2024 dollars · the project, its suppliers, and the wages workers spend locally
1Economic impactWhat does the project do to the regional economy?
Over the horizon. 2026–2037, in 2024 dollars: $71.0M of modeled output undiscounted and $57.1M in present value at a 4.0% discount rate. The undiscounted figure is the one usually quoted, and it adds 12 years together; the recurring level is in the tiles above.
How big is that. The project accounts for 0.28% of all jobs in Illustrative Region. For scale, all jobs in Illustrative Region: 22,628 jobs.
Who benefits. The modeled job mix for 64 jobs averages 10% below the regional median wage ($41,199 job-weighted average wage against a $46,000 median).
2Net regional captureHow much of that is new, and how much only moved?
Annual Operations: already net of displacement. 28% of its demand would have been spent in the region anyway, so $2.5M of gross annual output is removed and $6.4M is the modeled figure that remains. Basis: Intercept surveys at three comparable facilities.
Gross, not net
No displacement adjustment was applied to Construction. Those figures are gross: spending the region would have seen anyway is counted here as new. That share is unknown rather than zero. Displacement is the first correction we look for — a judgment from the twenty studies we read by hand, not a rate for the field.
No regional labor-market conditions were supplied, so every job above is counted as net new hiring. In a tight labor market some of those hires are people already working in the region moving between employers: the post gets filled and regional employment is unchanged.
3Fiscal ledgerWhat does the public treasury take in, and what does it pay out?
Average effective rates applied to modeled bases; the estimate carries the uncertainty of the bases. A further $798,859 a year is federal, and excluded. No tribal rate appears in the Illustrative County structure, so there is no tribal line — an absent rate, not zero revenue. Money in 2024 dollars.
| Level of government | Each year at full operation | One-time, during Construction |
| Local | $253,479 | $430,874 |
| State | $460,878 | $780,299 |
| State, local and tribal | $714,357 | $1,211,173 |
One side of the ledger only
Serving the households a project brings costs money — schools, roads, public safety. No service-cost structure was supplied here, so the cost side of the table above is missing. Whether the revenue covers it is the first question a commissioner asks. Nothing above may be read as a net fiscal gain.
4Credibility and recommendationHow far can this be relied on, and what do we advise?
Review: Provisional only — must be stamped throughout. Evidence: illustrative — not a finding.
Withheld
No recommendation is stated: the credibility gate ruled this study may not carry one. The evidence base is dominated by interested or placeholder sources. The recommendation is withheld until it is replaced — not because the answer would be unfavorable, but because no answer derived from this evidence would mean anything.
How firm is this? The multiplier ranges 1.32–1.81 across defensible method choices, a 27% spread. Every value in that range describes the same project analyzed a different way. Plan against the conservative end of that spread, 1.32.